A boring drill builds an exciting tunnel  OCT 19 2010

This is the massive drill that was used to bore a 35-mile-long tunnel underneath the Alps from mid-Switzerland to near the Italian border:

Big drill

Boring operations in the east tunnel were completed on 15 October 2010 in a cut-through ceremony broadcast live on Swiss TV. When it opens for traffic in late 2017, the tunnel will cut the 3.5-hour travel time from Zurich to Milan by an hour and from Zurich to Lugano to 1 hour 40 minutes.

Read more posts on kottke.org about:
photography   Switzerland   travel

kottke.org

Front page
About + contact
Site archives

Subscribe

Follow kottke.org on Twitter

Follow kottke.org on Tumblr

Like kottke.org on Facebook

Subscribe to the RSS feed

Advertisement

Ads by The Deck

Support kottke.org shop at Amazon

And more at Amazon.com

Looking for work?

More at We Work Remotely

Kottke @ Quarterly

Subscribe to Quarterly and get a real-life mailing from Jason every three months.

 

Enginehosting

Hosting provided EngineHosting